For more information
about BMRG
email us here

Updated: 21 July 2014

Some of the links on this page requires Adobe Reader, get it by clicking below:


Get Adobe Reader


Mostyn Coaching Stock Formations

As well as information from enthusiasts' observations made in 1977, the document on which the coaching stock formations on Mostyn are based is the British Railways LMR Passenger Train Marshalling Circular for 2nd May 1977 to 7th May 1978

We were lucky that a copy of this was loaned to BMRG member David Goodwin by Bill Rear some 20 years ago when the relevant sections for the North Wales Coast were typed up for future reference. Along with the observations from 1977, this data is used as the basis for the three bigger Mk1 coach rakes used on Mostyn as well as for the planned Mk2 and Mk3 rakes.

If you click here, BMRG present a ‘North Wales Coast’ version of the Coaching Stock Marshalling Circular, formatted in the style of the original document.

Although the LMR Marshalling Circular has been followed as faithfully as possible we acknowledge that mistakes may exist, and this is certainly the case where paper additions to the original document meant that other earlier data were obscured. Where some of the obscured data were recorded in the notes made in the mid-90s, this is shown in red.

Addendum - Since this information was first added to the BMRG website, the BR Passenger Train Marshalling Circular described above, along with a second copy, is now in the possession of Robert Carroll.  Robert has a yahoo group called BRCoachingStock dedicated to all things related to 'British Railways operated coaching stock'; he and other members of the group have spent time and effort collecting and creating elecronic copies from these Marshalling Circulars, including those relevant to 1977.  Readers are well advised to join this group if they are interested in the history and operation of BR coaching stock.


Mk1 Coaching Stock Formations

Prototype: 16 41 Holyhead to Euston (runs 23 July to 3 Sept.)
Vacuum Braked / Dual Heated / 100mph
Model: Built by David Goodwin & Richard Oldfield, based on Southern Pride kits, introduced Feb. 2000

Coach

Booked Formation

Actual Formation

Number

Diag.

Bogies

Lot no.

A

Mk1 BSK

Mk1 BSK

M35296

181

CW

30699/62

B

Mk1 SK

Mk1 SK

M25304

146

BR1

30349/57

C

Mk1 SK

Mk1 SK

M24045

146

BR1

30002/51

D

Mk1 SK

Mk1 SK

M25719

146

CW

30685/61

E

Mk1 FK

Mk1 FK

M13108

116

B4

30107/54

F

Mk1 SO

Mk1 TSO

M3766

93

BR1

30079/53

G

Mk1 RBK

Mk1 RKB

M1500

25

B5

30514/59

H

Mk1 SK

Mk1 SK

M25377

146

Modified BR1

30349/57

J

Mk1 SK

Mk1 SK

M25808

146

CW

30685/61

K

Mk1 SK

Mk1 SK

M25738

146

CW

30685/61

L

Mk1 BSK

Mk1 BSK

M35061

181

BR1

30233/56


Prototype: 13 05 (SO) Llandudno to Nottingham (runs 4 June to 3 September)
Vacuum Braked / Dual Heated / 100mph
Model: Built by David Goodwin & Richard Oldfield, based on Southern Pride kits, introduced Feb. 2000

Coach

Booked Formation

Actual Formation

Number

Diag.

Bogies

Lot no.

A

Mk1 BSK

Mk1 BSK

M35190

181

BR1

30427/58

B

Mk1 SK

Mk1 SK

M24434

146

BR1

30030/53

C

Mk1 SK

Mk1 SK

M24859

146

BR1

30153/55

D

Mk1 SK

Mk1 SK

M26001

146

CW

30719/62

E

Mk1 CK

Mk1 CK

M16137

126

BR1

30577/59

F

Mk1 SK

Mk1 SK

M25866

146

CW

30685/61

G

Mk1 SK

Mk1 SK

M25686

146

BR1

30426/57

H

Mk1 SK

Mk1 SK

M25558

146

BR1

30426/57

J

Mk1 BSK

Mk1 BSK

M35460

181

CW

30721/63


Prototype: 0933 Scarborough to Llandudno (runs 23 July to 3 Sept.)
Vacuum Braked / Dual Heated / 100mph
Model: Built by David Goodwin & Richard Oldfield (except M35176 by David Goodwin), based on Southern Pride kits, introduced Feb. 2000

Coach

Booked Formation

Actual Formation

Number

Diag.

Bogies

Lot no.

A

Mk1 BSK

Mk1 BSK

M35176

181

BR1

30427/58

B

Mk1 SK

Mk1 SK

M25591

146

BR1

30426/57

C

Mk1 SK

Mk1 SK

M25410

146

BR1

30350/57

D

Mk1 SK

Mk1 SK

M25999

146

CW

30719/62

E

Mk1 CK

Mk1 CK

M16059

126

BR1

30471/58

F

Mk1 CK

Mk1 CK

M16184

126

CW

30665/61

G

Mk1 SK

Mk1 SK

M25615

146

B4

30426/57

H

Mk1 SK

Mk1 SK

M24578

146

BR1

30057/53

J

Mk1 SK

Mk1 SK

M26014

146

CW

30719/62

K

Mk1 BSK

Mk1 BSK

M34526

181

BR1

30095/55



Mk2 Pressure-Ventilated Coaching Stock Formations - under construction




Mk2 Air-conditioned Coaching Stock Formations - future project




Images for personal non-commercial use only. Click to
                      return to previous page
All Rights Reserved © 2014 Barrowmore Model Railway Group